Project Updates
Project Facts
  • City Project Engineer
    • Chris Dunnaway
      Email
      Ph: 417-864-1876
  • Completion
    • Spring 2014
  • Contractor
    • Hartman Construction
  • Cost
    • $1,100,000
  • Design Engineer
    • Olsson Associates
  • Design Features
    • Improvements to existing outlet structure to address erosion issues
    • Remove existing debris and reshape pool to improve the water way
    • Preserve existing grates in the trail at outlet box to accommodate the existing spring and low spot
    • Stabilize the southern bank near box culvert with decorative retaining wall
    • Reroute drainage along the west side of scenic to flow between new trail alignment and driving range berm to minimize water flowing across trail
  • Funding Sources:
    • 2006 County-wide Parks Sales Tax Lakes, Streams, and Waterways
  • Location
    • Close Park
  • Objectives
    • This project includes stabilization and beautification of the spillway to address erosion that has occurred after floods in recent years. The project includes enhanced views of new water features being created. It also includes improvements at both ends of the South Creek culvert under Scenic Avenue and improvements to the South Creek Greenway Trail.
  • Partners
    • Ozark Greenways
    • Public Works Stormwater Engineering
    • Springfield-Greene County Park Board
Downloads
Concept Plan (PDF)